How long does it take to localize a catalog?
Real timelines by project size, including the step most quotes hide: your approval of the sample.
The sample: 48–72 hours
Once we have your files (and voice samples for cloning), the 3-minute sample in the target language is ready in 48–72 hours. Your approval — or your adjustment notes — starts the production clock.
Production speed
Studio voice: roughly 60 finished minutes per 5–7 business days. Cloned voice: 60 minutes per 7–10 business days, because the clone pass and its QA take longer. A full 180-minute Catalog Pack typically lands in 2–3 weeks.
What slows projects down
Missing source files, uneditable graphics and slow sample feedback are the three real delays. Everything on our side runs against the published quality checklist, which is why we quote ranges instead of promising a date we can't sign.